Total Park

A new industrial / logistics development of five units totalling 376,419 sq ft.

Units from 43,525 – 128,945 sq ft.

Read more
Total Park

Total Park, Doncaster is a new industrial / logistics development of 5 units totalling 376,419 sq ft, with units from 43,525 – 128,945 sq ft. Total Park is located just a mile and a half from the M18 J3 and is easily accessible via the A6182.

Doncaster is a proven location and has since established itself as a leading logistics location, attracting occupiers such as Amazon, Tesco’s, Screwfix, and IKEA.

Location:

Occupiers at the Total Park, Doncaster are ideally located for nationwide logistics coverage and access to overseas markets. With the A1(M)/M18 intersection located just 3 miles from the site, there is strong transport links to Leeds, Sheffield and Manchester in the North and Nottingham, Birmingham and London in the South offering a perfect central location.

The site is only 3.5 miles from iPort rail which provides immediate access to the national rail network and rail links to all the countries deep sea ports within 7 hours. It is also under an hour from east coast ports, such as Immingham and there is access to the European markets, with Central Germany, Northern Italy, and French terminals reachable in 30, 36 and 24 hours respectively.

The UK’s largest dedicated air cargo operation, handling 440,000 tonnes of cargo per year, at East Midlands airport, is within an hour of the site by road. It is a hub for companies such as DHL, FedEx and UPS. With cities, such as Manchester and Birmingham within an hour a half drive and London just over 3 hours away, Doncaster provides an ideal location for businesses that thrive on great connectivity

DestinationDistanceTimeM18 (J3)1.5 miles4 minsDoncaster2.0 miles5 minsA1(M)/M18 Instersection3.0 miles6 minsSheffield15 miles34 minsLeeds35 miles58 minsManchester58.3 miles1 hour 20 minsBirmingham93 miles1 hour 25 mins

Accommodation:

External

Secure, self contained plots, yard depths between 45m and 49m, security lighting, extensive car parking, cycle parking, motorcycle parking and car charging points.

Warehouse:

Clear heights of 10-15m, 50kN/m2 floor loading and Rooflights to 15%.

Office:

Fully fitted to upper floors, raised access floor, suspended ceilings and teapoint / welfare facilities.

Accommodation sizes:

 SQ FTSQ MGround Floor117,45410,911.81First Floor Office5,746533.81Second Floor Offices5,746533.81Total128,94511,979.43

 SQ FTSQ MGround Floor59,9345,568.02First Floor Office5,455506.80Total65,3896,074.83

 SQ FTSQ MGround Floor76,7857,133.51First Floor Office7,272675.58Total84,0567,809.10

 SQ FTSQ MGround Floor49,5044,599.03First Floor Office5,000464.50Total54,5035,063.53

 SQ FTSQ MGround Floor39,5593,675.17First Floor Office3,966368.46Total43,5254,043.62

Sustainability:

  • High performace building fabric envelope via enhanced U-values to reduce heating demand
  • High performance windows via solar controlled glazing to reduce cooling demand
  • Low building air permeability to reduce heating demand
  • Warehouse roof lights to ensure adequate daylight
  • High efficiency heating and cooling system via VRF air conditioning
  • Motion censored high efficiency LED lighting and lighting controls to the offices
  • Heat recovery ventilation
  • Provision for photovoltaic solar panels

For more information contact Alex Dochery

Download the Total Park brochure

Last updated: 03 September 2024, 17:50